Marine and Civil Diving Services Ltd were contracted by Marron Civil Engineering  Ltd to provide diving services. Whilst carrying out excavation works for installation of a drainage pipe run, the trench began to fill with water. It was assumed that the water source is the adjacent lake and that the excavation works have caused damage to a buried culvert.

The Dive Team repaired the damaged culvert and drained the site successfully for works to continue.

Other Projects

Fulham FC New Riverside Stand
Buckingham Group
Project Type: Construction

Project Duration: July 19 – March 22
READ MORE
Plaistow and Royal Primrose Wharves
Keltbray Ltd
Project Type: Construction

Project Duration: Nov 21 – May 22
READ MORE
Nearshore / Inland Warerways

Lake

Subsea

Health and Safety

No accidents and incidents

Marron Construction

Project Value:

Dates:

March 2020
PREVIOUS
Southend UXO Survey and Removal
NEXT
Wapping Police Pier Cathodic Protection Installation

Overview

Marine and Civil Diving Services Ltd were contracted by Marron Civil Engineering  Ltd to provide diving services. Whilst carrying out excavation works for installation of a drainage pipe run, the trench began to fill with water. It was assumed that the water source is the adjacent lake and that the excavation works have caused damage to a buried culvert.

The Dive Team repaired the damaged culvert and drained the site successfully for works to continue.

Nearshore / Inland Warerways

Lake

Subsea

Health and Safety

No accidents and incidents

Menu